On inspecting a bad spot in the ranchwall on the southside of the Cabin in Millville, I found that sveral places contained progressing rot. On removing some to the ranchwall, found that felt had been used over the studs, and no rot, which was a major relief, as it is a big job to replace studs. Clayt and I then set about to install new 3/8 plywood, as ranchwall of the type used on the cabin when it was built, is no longer available. We chaulked the seems and did a really good job of installing the new siding.
Clayt looks to be happy with job. Later that day he painted it and made it look like a professional job
Sunday, May 18, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment